Installation instructions for panel-mounting a Process Meter LC30

1. Cut holes in panel using diagram
2. Position LC30 over holes
3. Insert bolts from front and install nuts loosely in back
4. Tighten nut until snug, but not too tight
5. Connect pressure / temperature connections
6. Connect power via approved power adapter D-000410
Recent Articles
Connect one or more Ralston gauges to FieldLab Desktop App with Bluetooth
What you will need: One or more Bluetooth-enabled Ralston Gauge. How to tell if your Field Gauge has Bluetooth. The FieldLab Desktop app installed on your Windows computer. Version 1.40.4 or later. Update FieldLab Desktop to the Latest Version. 1. ...
A Gauge is Overpressurized
Before applying pressure to your Ralston gauge, confirm that the gauge is rated for higher than the max pressure that will be applied. Gauges that have been overpressured above 33% of max rating will be unable to display or log accurate pressure ...
Determine the max pressure for your Ralston gauge.
Before applying pressure to your Ralston gauge, confirm that the gauge is rated for higher than the max pressure that will be applied. Gauges that have been overpressured above 33% of max rating will be unable to display or log accurate pressure ...
Connect the correct thermal probe to your Field Gauge
Detachable thermal probes are not interchangeable with other Field Gauges. Each temperature probe is calibrated precisely to the Field Gauge it ships with at Ralston Instruments' ISO/IEC 17025:2017 Accredited lab. To log temperature data to the ...
Troubleshooting Bluetooth Connections for Process Meter LC30
Link to article: Troubleshooting Bluetooth Connections for Field Gauge LC20 and Process Meter LC30